Do I need to prepare anything before you visit?

Edited

Before our visit, make sure you:

  • Enable Daily Vents on the HMI.

  • Put override rocker switches to auto position.

  • Make sure that pressure switches and sensors are piped the right way by paying attention to the markings on the device as it should state ‘+/-‘ or ‘high/low’.

  • Ensure the size of crimp or crimper setting matches ferrule.

  • Review scheduled equipment carefully at the design stage to avoid panel designs not accommodating the installed equipment.