Do I need to prepare anything before you visit?
Edited
Before our visit, make sure you:
Enable Daily Vents on the HMI.
Put override rocker switches to auto position.
Make sure that pressure switches and sensors are piped the right way by paying attention to the markings on the device as it should state ‘+/-‘ or ‘high/low’.
Ensure the size of crimp or crimper setting matches ferrule.
Review scheduled equipment carefully at the design stage to avoid panel designs not accommodating the installed equipment.